Skip to main content
C

Car Parks

Car park projects not only demand robust and, efficient solutions, but minimal downtime. WestWood’s PMMA system delivers on every front.

With fast curing times and the ability to bond directly to concrete substrates, our system is critical in reducing financial and operational impacts on clients and end-users. Whether it’s a multi-storey car park, underground facility, or high-traffic ramps and entrances, our durable, textured surfacing is designed to withstand heavy-duty vehicular stress while providing a non-skid, abrasion-resistant finish.

We work closely with our contractor partners, guiding each phase of the car park to ensure on-time completion and long-lasting results. Available in a wide range of RAL colours, our award-winning PMMA solutions enhance both the functionality and aesthetics of car park refurbishments.

Top deck Car Park, Chelmsford

Top deck Car Park, Ferndown, Dorset

Top deck car park, The Plaza, Wokingham

Interdeck car park, Chester

Top deck car park, NCP Glasshouse, Scotland

Top Deck car park, NCP Leeds

Top deck Loading bay, Daventry

Top deck car park, Greater Manchester

Case Studies

T

The Plaza

Five levels of a multifunctional car park have been refurbished using WestWood’s products, requiring meticulous planning.

READ MORE