Skip to main content
B

Winslade House

Complete roof terrace refurbishment with tile-effect finish

Project: Winslade House

Size: 525 m sq.

Substrate: Concrete

WestWood products:

  • SA/VB adhered with Bonding Agent 
  • Tapered PIR Tissue Faced Insulation adhered with Insulation Adhesive
  • 12mm Cement Board adhered with Insulation Adhesive 
  • Wecryl 176 
  • WMP 174s
  • Wecryl R230thix 
  • Wecryl R230 
  • Wecryl 333
  • Wecryl 488 Tile Effect 
  • Wecryl 420 Tile Effect 
  • Wecryl 815
  • Wecryl 810

The Challenge

Originally constructed in 1983 and later left vacant for years, the building’s terraces had outdated asphalt waterproofing which had developed leaks, demanding a replacement. Burrington Estates, the new owners of the building, requested a waterproofing system that would also provide a durable, visually appealing surface suitable for the building's mixed-use environment. Given the building’s high-traffic areas, efficient rainwater drainage and thermal performance were essential. Access challenges, complex insulation needs, and noise restrictions due to occupied offices further complicated the project.

The Solution

Progressive Coatings Ltd., in partnership with WestWood, installed a durable waterproofing system on the two roof terraces totalling 460m². The solution included a tapered PIR insulation scheme for effective drainage, covered by impact-protective cement board. WestWood’s warm roof system with a tile effect finish provided the aesthetic enhancement required. To ensure minimal weather-related disruptions, Progressive adjusted work practices, sealing partially completed layers daily to protect the terraces from rain and adjusting schedules to avoid extreme temperatures. Despite access limitations, about 40 tonnes of material were removed by hand to prepare for the new installation.

The Outcome

The project was successfully completed on schedule and within budget, enhancing Winslade House with two functional, visually pleasing roof terraces. The trafficable surfaces not only support office and restaurant use but also contribute to the building’s thermal efficiency. Noise restrictions were managed without disruption to tenants, and weather precautions maintained the quality and integrity of the installation. The renovation process also served as a learning opportunity for Progressive Coatings' new apprentice, who has since become a valuable team member. Burrington Estates was highly satisfied, gaining a revitalised terrace space that complements the building's character and functionality.

Downloads

References

B
Balcony

San Remo Towers

Intricate roof terrace refurbishment in the heart of Poole, Dorset

B
Balcony

Winslade House

Complete roof terrace refurbishment with tile-effect finish

P
Parking

The Plaza

A five-level multi-storey car park refurbishment

R
Roofs

Millstream West

Complex roof refurbishment in the energy sector

R
Roofs

Lawrence Hall

Restoration of a unique roof space in London

S
Special

The Wedding Cake

Waterproofing installation on a structural piece of art

S
Special

Shmuseum

Unique floor surfacing for a high-end car showroom

all References